Factory Supply POM PTFE Spur Gear Design Plastic Injection Mould Machine Part

Factory Supply POM  PTFE Spur Gear Design   Plastic Injection Mould Machine Part

Company Data

   ZheJiang CZPT CZPT Building Co., Ltd is a comprehensive organization which concentrate on creation, advancement and sale of engineering plastics, rubber and multiply non-metallic items given that 2015
 
   We have set up a excellent popularity and constructed extended-time period and secure cooperation connection with many domestic organizations and progressively phase out to cooperate with overseas businesses in southeast Asia, the Middle CZPT, North CZPTica, South CZPTica, CZPTe and other areas.
   
   Our principal merchandise: CZPT higher molecular bodyweight polyethylene, MC nylon, PA6, POM, HDPE, PP,PU, Laptop, PVC, Stomach muscles, ACRYLIC,PTFE, PEEK, PPS,PVDF.
 

Product identify PTFE / POM components
CZPT materials PTFE, POM, PVC, Nylon, PEEK, PU, PA, Acrylic, PE, UPE, etc.
colour White, black, or as your necessity
Certification ISO9001, SGS, Test Report, RoSH
Form Sheet, rod, tube, gear, rack, pulley, guidebook rail, CZPTs fittings, and so on.
Packing CZPT bags, Cartons, Wodden circumstance, Pallet, Container, and so forth.
Other All day time instantaneous and cozy consumer services.
CZPT standing notification for the duration of supply.
Regular notification of new designs and scorching offering types.

FAQ

1.Q: Are you a manufacturing unit or trading business?
    A:We are a factory and have more than twenty several years manuafacture and sales experience.

2.Q:What type of plastic merchandise can your manufacturing unit make?
    A: Custom UHMWPE,Nylon,POM,PTFE PP,PVC,Computer, and so on.

3.Q: Which sort info want for quotation?
    A:one)  Sample image with dimensions or 2nd/3D design and style
      two)  Product content
      3)  solution amount

four.Q:How about the samples?
   A: Following mildew completed, We will make  sample for you to examine as quickly as we complete the mildew .

five.Q: What is actually your supply time?
   A:For typical goods, we preserve them in inventory. The distinct shipping and delivery time relies upon on the products and the quantity of your order, it’s about twenty times.

6.Q: What is your terms of payment?
   A: T/T thirty% as deposit, and 70% ahead of delivery. 

Packing & Shipping and delivery

 

Factory Supply POM  PTFE Spur Gear Design   Plastic Injection Mould Machine Part

gear pump

As one of leading gear pump manufacturers, suppliers and exporters of mechanical products, We offer gear pump and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of gear pump

Recent Posts